Dokončeno

Engineering, building architecture, interior design, civil engineering and excel

Tento projekt byl úspěšně realizován uživatelem Chuk77 za £150 GBP za 14 dní.

Získat bezplatné nabídky k podobnému projektu
Rozpočet projektu
£20 - £250 GBP
Realizováno za
14 dní
Nabídky celkem
6
Popis projektu

Complete bill of material for a 4 story apartment block in Buea Cameroon. This is a very detailed BOQ with plumbing fixtures, electrical fixtures (lights/chandeliers, wiring, switches, sockets, distribution boards), plumbing fixtures (toilets, baths, sinks, taps, drains, air conditioning, drainage & water supply pipes for hot and cold water). The hot water will be supplied by a series of hot water tanks with integrated heating elements located on the roof top.

This will also include tiles for the floor and bathrooms, plaint for the exterior (self cleaning) and interior. Kitchen appliance including induction hub and mashing machine and tumble dryer.

We discuss minor details as the project progresses to ensure that all is covered.

Uskutečněno uživatelem:
Požadované dovednosti

Máte zájem si vydělat?

  • Zadejte váš rozpočet a dobu trvání práce
  • Ve zkratce popište svůj návrh
  • Nechte si za vaši práci zaplatit

Zaměstnejte freelancery, kteří na tento projekt zveřejnili nabídku

    • Forbes
    • The New York Times
    • Time
    • Wall Street Journal
    • Times Online