Mesa Substation 500kV Upgrade Project

Ukončen Zveřejněno před 5 lety K zaplacení v momentě doručení
Ukončen K zaplacení v momentě doručení

The project will primarily consist of:

Upgrade the existing Mesa Substation in Monterey Park from 220 kilovolt (kV) to a 500 kV substation.

Replacement (removal and installation) and modification of transmission lines, subtransmission lines, and distribution structures to accommodate the new Mesa Substation layout.

New telecommunications lines and modifications to an existing line, mostly on existing poles and in existing ducts.

Temporary modifications to 220-kV equipment at several existing substations to prevent electrical outages during construction.

Relocation and replacement of an existing Metropolitan Water District 72-inch-diameter waterline with an 84-inch-diameter waterline through the substation site.

Electrical and/or telecommunications equipment upgrades at 28 existing substations, mostly in other nearby communities.

Close

Stavební inženýrství Elektrotechnika

Identifikační číslo projektu: #18331178

O projektu

9 nabídek Projekt na dálku Aktivní před 5 lety

9 Freelnceři na tento projekt zveřejňují nabídky v průměru $64413

ProjexConsultant

I can provide design services for your substations upgrades and utilities modifications. I can provide layouts for gas insulated switchgear and fluid filled transformers and coordinate design requirements with other en Další

$52000 USD za 30 dní
(11 Recenzí)
5.3
umg536

Hi there, I have read your project description and i'm confident i can do this project for you perfectly.I still have a few questions. please leave a message on my chat so we can discuss the budget and deadline of the Další

$55500 USD za 3 dní
(2 Recenzí)
3.4
engrzishansabir

We are in an era of “Technological Revolution” in each and every aspect of life due to the momentum of change. This growth has modernized the world in the way we think, live, work and interact. To stay ahead in the fas Další

$55555 USD za 10 dní
(7 Recenzí)
2.7
zaraza73

I am an electrical engineer, MSC in applied mathematics, MSC in power systems, PHD. Control and automation. I can make your problem at any level, within my proposal, I can offer you additional extras. with 23 years of Další

$50000 USD za 10 dní
(1 recenze)
0.6
nymul66

Hi, I am nymul. I read your project details carefully. I can do your work perfectly . Expertness and honesty is my goal. My main target is customer satisfaction. So you will satisfy 100% after complete the project. Wil Další

$55555 USD za 10 dní
(0 Recenzí)
0.0
lsmircic

Electrical engineer with 10 years experience in the industry, mostly on substation and substation automation, SCADA , control and power projects. Leading commissioning, design, as well as tendering and sales teams. Další

$99999 USD za 365 dní
(0 Recenzí)
0.0
Abdelmonemmousta

I'm an senior electrical engineer ,work in the largest consultancy group(shaker) in the middle east in Egypt ,you can ask about this group ,and we do so many projects like this project in the same voltage level and ano Další

$100000 USD za 70 dní
(0 Recenzí)
0.0