Hi,
iam a British national and proof reader for many journals and i hold a PhD in Engineering. i have published many journals and i can deliver this work perfectly. we need to look at the structure of the paper first, then the content and technical validity. and the last step will be the English proofreading.
check the quality of work below for some of my publications:
Alterawi, M. (2012). The Use of Road Narrowing “Throttle” as traffic calming: Modelling junction operation. SPARC Conference. University of Salford, UK.
Yousif, S., Alterawi, M. and Henson, R. (2013). Effect of road narrowing on junction capacity using microsimulation. ASCE, Journal of Transportation Engineering, 139(6), pp.574-584.
Yousif, S., Henson, R., Alterawi, M. (2014). Red light running and close following behaviour at urban shuttle-lane roadworks. Journl of Accident Analysis and Prevention, 66(1), pp.147-157.
Alterawi, M. and Yousif, S. (2013). Site Observations of Aggressive Drivers’ Behaviour at Urban Roadworks – A case study from Greater Manchester. Dean’s Annual Research Showcase. Poster and abstract. University of Salford, UK.
Alterawi, M. and Yousif, S. (2014). Micro-simulation model for shuttle-lane roadworks operated by temporary traffic signals. IEEE, 15(5), pp.2159-2168.
thanks